Ultimate magazine theme for WordPress.

NIMASA set to install modular floating dock

The Nigerian Maritime and Safety Administration (NIMASA) has commenced preparations to deploy its Modular Floating Dock.

The Agency disclosed on Tuesday that it moved the Floating Dock to a jetty at the Standard Flour Mills in Apapa, in preparation of its movement to the scheduled operational base at the Continental Shipyard, Apapa.

The heavy 50-ton cylindrical spuds, which are for anchoring the dock, are being prepared for installation.

We are moving slowly but steadily to our destination. Today, we are lifting out the cylindrical studs to be prepared for piling at the Continental Shipyard where the Floating Dock is scheduled to commence operations. These spuds have to be firmly installed before we can tow the Floating Dock there. We assure stakeholders that very soon, Nigeria will save foreign earnings with the commencement of operations of our Dock, Jamoh stated.

NIMASA recall that the Nigerian Ports Authority (NPA) leased designated areas at the Continental Shipyard for the operations of the Modular Floating Dock in 2023.

It said the areas include the Dolphin Jetty, waterfront of the jetty adjourning the slipway, an administrative block, a construction, welding and mechanical workshop and a civil maintenance workshop, among others.

According to NIMASA, the project would run on a Public Private Partnership (PPP) arrangement.

 

Leave A Reply

Your email address will not be published.